Do You Know How Long It Will Take To Install A Shuttle Rack? Rack Installation Time
In recent years, due to the rapid development of online shopping, factory orders have increased greatly, resulting in a large increase in the demand for storage shelves.
Among them, shuttle racks are favored by many enterprises.
It should be noted that since shuttle shelves require customization, it takes time from production to installation.
Enterprises need to plan ahead when arranging order items.
So, do you know how long it will take to install a shuttle rack of 5000-10000 square meters?
The shuttle warehouse shelf is a kind of automated warehouse, and the precision requirement is higher than the non-intelligent storage shelf.
So for the same number of cases, the production cycle is longer, and the time to install and debug is longer.
Installation of 5000-10000 square meters of shuttle shelves generally takes more than half a month, depending on the degree of cooperation between customers and manufacturers.
It will take about 2 months or even longer for a warehouse project of 5000-10000 square meters to design, order production, and transport and installation.
Therefore, the urgent use of the warehouse needs to do early planning as soon as possible.
RECOMMEND INFORMATION
-
Vegetable cold storage racks, storage density is fullJuly 24, 2024
-
Shuttle warehouse racks can be designed how many layersJuly 22, 2024
-
Cold storage shuttle rack, warehouse rack top flowJuly 22, 2024
-
Shuttle rack priceJuly 08, 2024
-
How much is the shuttle rackJuly 04, 2024
-
Shuttle rack wholesale priceJuly 02, 2024
-
Shuttle rack costJune 26, 2024
-
How much is the shuttle rackJune 25, 2024